1 Oct 2026
Structure reaches level 10
Overall progress
24%
as of 1 Oct 2026

In September the structure reached level 10 on schedule, and the site engineers signed off the basement services.
- Level 9–10 slabs poured
- Second material hoist installed
- Walls started on levels 2–4
Sample figures — use your site engineer's real reports.