Aster Ari

1 Oct 2026

Structure reaches level 10

Overall progress

24%

as of 1 Oct 2026

Cranes on a building under construction

In September the structure reached level 10 on schedule, and the site engineers signed off the basement services.

  • Level 9–10 slabs poured
  • Second material hoist installed
  • Walls started on levels 2–4

Sample figures — use your site engineer's real reports.